Regular Call for Semester 16X

Semester Information

Semester start of observing 2016-10-03 00:00 UT
Semester end of observing 2017-02-01 00:00 UT

The East Asian Observatory invites observing proposals with Principal Investigators (PIs) from its partner regions (China, Japan, South Korea, Taiwan) or from eligible PIs in the UK and Canada.

Available Instruments

Important Notes

Content of Proposal

Proposal authors are expected to provide separately both a Scientific and a Technical Justification for their proposed observations. These justifications should be substantiated with results from our integration time calculators to show that the proposed observations will reach the necessary noise limits for your science goals. The calculators are integrated into our proposal submission system, and you should use them to save your calculation(s) to your proposal.

Calibrations

Overheads for pointing, focusing, and calibrations should not be added to the time request. These activities will be accounted for separately. Calibration observations (e.g. focus, pointing, flux calibrators) and other unavoidable overheads (e.g. receiver tuning) are not charged to science projects and instead are charged to an observatory accounting code. There is therefore no need for applicants to provide calibration overhead estimates in their proposals. The observatory will perform regular and appropriate calibration observations to ensure that all science data obtained are sensibly calibrated.

If a proposal demands more unusual or more frequent calibrations then this needs to be clearly stated in the proposal and the time for these calibrations requested explicitly. If you have queries about what our default calibrations might be or what extra overheads are generated by your calibration requirements please get in touch with us.

Previous Proposals

The proposers should provide information on any previous, successful JCMT allocations, including any papers published as a result or the status of the project. The success of previous projects can be taken into account when awarding time, so it is in your interests to provide full information on this. A section is included within the proposal submission system for this information.

Data Available from the Archive and Large Programs

We expect all proposers to check that there are not already existing public data that meet your science needs, or conflicting large programs, before you submit your proposal. To help you with this, we have built in a clash tool which you can use to search for potential “clashes” between your proposed objects and available data sets. It also provides a link to an archive search for each target position. It is your responsibility to ensure you comment sufficiently on why any matching data does not meet your needs — e.g. because it does not reach sufficient depth, or because is not at the right frequency, or because the observations were not of sufficient quality.

The ‘Outreach’ version of your science

Please provide a paragraph describing the goals of your proposal in the “Public Summary” section — a translation of your abstract might be a good starting point. We will use this in JCMT outreach efforts.

Flexible Scheduling

The overall philosophy of observing at JCMT is to match observing programs to the weather — see the Flexible Observing Guidelines for more information — so data can be acquired for a project at any time, even without the applicants being in attendance at the telescope. A summary was also given at the January 2015 Workshops.

Observer status

Please use the “Members” section of the proposal form to express your willingness and ability to travel and observe. Observers are invited on the basis of their project demands and TAC ranking, and will receive additional priority when in attendance. Observers are needed to staff the observatory each night that a TSS is present at the telescope, although we now also operate JCMT remotely on some nights; affected observers should still attend in order to retain their enhanced priority.

Further Questions